ENGINEERING GEOLOGY, cilt.68, ss.159-169, 2003 (SCI-Expanded)
This paper describes the seepage prevention measures at Kalecik Dam. Water leaked from the foundation of the dam after the impoundment. The dam, 77 m in height, was constructed for irrigation purposes.